
First sighting of Ibiza
Related Post
Grinding Down the DeckGrinding Down the Deck

Packaging artist Christo was here
Osmosis Treatment on the top deck of Lunara. Today, we finally started the partial gelcoat removal on the coach roof. Boat is dusty everywhere. We hoped for a grinder with integrated dust removal. That is not happening – sadly. The weather window is marginal, meaning temperature and humidity levels are a notch above the minimum required for this work. Thank god we are in Southern France.
Can’t make a photo of the actual work since I lack the protective equipment for myself.

Dust protection

Taking measure with the new solar panels
Underway Almerimar, Spain to Ragusa, ItalyUnderway Almerimar, Spain to Ragusa, Italy
Aug 27, 0835h
Our plan today, was sailing to Bizerte, Tunisia. Tunisia categorized Spain, effectively today, as high risk (red) country. This means no landing is allowed for anyone coming from Spain.
We are sailing now to Ragusa, Italy. This is in the south of Sicily. Always wanted to go there anyway. Our eta is Sept 1 in the morning.
In Ragusa we might have to take a PCR test. After 14 days in Italy we could go to Tunisia.
Let’s see!
