Day: November 29, 2018

Grinding Down the DeckGrinding Down the Deck



Grinding down the deck #3 11 29

Packaging artist Christo was here

Osmosis Treatment on the top deck of Lunara. Today, we finally started the partial gelcoat removal on the coach roof. Boat is dusty everywhere. We hoped for a grinder with integrated dust removal. That is not happening – sadly. The weather window is marginal, meaning temperature and humidity levels are a notch above the minimum required for this work. Thank god we are in Southern France.

Can’t make a photo of the actual work since I lack the protective equipment for myself.

Grinding down the deck #5 11 29

Dust protection

Grinding down the deck #4 11 29

Taking measure with the new solar panels